23 August 2011

all in due time...all in due time.

After a quick stop at the local Harbor Freight, I came home to work on the pan of the Variant.  I managed to get the front beam torn down and removed, the rear suspension triangle removed and the pan.  A lot of work in a short period of time.  I seem to be able to get a lot done when I don't have an agenda or a time constraint.

The pan is definitely going to need to be replaced...too much rust through to repair and have it last very long.  My goal for the Winter is going to be to rebuild the front beam and rear suspension triangle and have them ready for install when the pan is rebuilt.

It's all in a hundred pieces in the garage-I'll have to get it cleaned and organized a bit better until I have time to work on it again...maybe next week.

It was a good night and very productive...and relaxing at the same time.

No comments: